Reorder point calculator: when to reorder and how much
Enter what you sell in a day and how long your supplier takes. Get the safety stock, the reorder level to order at, and a suggested order rounded up to whole packs.
Optional
Units per carton or sack
When to reorder
Reorder level
120 units
How the reorder point calculator works
Reorder level
Reorder level = average daily sales × lead time in days + safety stock
Safety stock, by days of cover
Safety stock = safety days × average daily sales
Safety stock, from your worst case
Safety stock = maximum daily sales × maximum lead time − average daily sales × average lead time
Order quantity
Order quantity = average daily sales × days to order for, rounded up to whole packs
How to use the reorder point calculator
The reorder point calculator tells you the stock level at which to place your next order, so new stock arrives before the shelf is empty. All figures are in units, such as pieces, packets or kilograms, and results are rounded up to whole units.
- Average units sold per day: the total sold over a normal period, such as the last 30 or 60 days, divided by the number of days.
- Supplier lead time: the days from placing an order to having the stock ready to sell.
- Safety stock method: Days of cover keeps a fixed number of days of extra stock. From your worst case uses your busiest day and your slowest delivery, so it also asks for maximum daily sales and maximum lead time.
- Order enough for N days and pack size (optional): get an order quantity that covers that many days of sales, rounded up to whole packs, such as cartons of 12 or 25 kg sacks.
The reorder level formula in plain words
The reorder level is the stock you will sell while you wait for the delivery, plus a cushion. If you sell 20 units a day and the supplier takes 5 days, you sell 100 units while waiting. Add safety stock for the days that go wrong, and the total is your reorder level.
Safety stock covers two risks: selling faster than usual and the supplier arriving late. Days of cover is the simple way: decide how many extra days of sales you want on hand. From your worst case works it out from your own history: the stock your busiest day would need over your slowest delivery, minus what a normal day over a normal delivery needs.
The order quantity is a separate decision. The reorder level tells you when to order; the order quantity tells you how much. Ordering for more days means fewer orders but more money tied up in stock.
Worked reorder level and safety stock examples
A kirana store, by days of cover. The store sells an average of 18 one-litre pouches of cooking oil a day. The distributor delivers 4 days after the order, and the owner wants 3 days of safety stock. Safety stock is 3 × 18 = 54 pouches, and the reorder level is 18 × 4 + 54 = 126 pouches. An order for 15 days is 18 × 15 = 270 pouches, which rounds up to 23 cartons of 12, or 276 pouches.
A masala maker, from the worst case. The unit uses 40 kg of red chilli on an average day and up to 65 kg on the busiest days before Diwali. The supplier usually delivers in 6 days but has taken 10. Safety stock is 65 × 10 − 40 × 6 = 650 − 240 = 410 kg, and the reorder level is 40 × 6 + 410 = 650 kg. An order for 21 days is 840 kg, or 34 sacks of 25 kg.
With this method the reorder level always equals your busiest day times your slowest delivery. It is safe, but it can tie up a lot of stock, so keep it for items you cannot afford to run out of.
Festival season. If the kirana's oil sales rise to 30 pouches a day in festival weeks, the same 4-day lead time and 3 days of cover give a reorder level of 30 × 4 + 90 = 210 pouches. Recalculate before the season starts, not after the first empty shelf.
Reorder level mistakes to avoid
A reorder level is only as good as the numbers behind it. Watch for these.
- Counting stock you cannot sell. Expired, damaged or reserved stock should not count towards the reorder level.
- Forgetting stock already on order. Compare the reorder level with stock on hand plus what is already ordered, or you will order twice.
- Measuring lead time from the supplier's dispatch. Count from the day you place the order to the day the stock is on the shelf, including payment, transport and unloading.
- Taking the average from days you were out of stock. Zero sales on those days meant zero stock, not zero demand, so the average comes out too low.
- Keeping too much safety stock on short-shelf-life goods, such as fresh snacks or dairy, where extra days of cover can turn into expired stock.
- Setting the level once and never changing it. Review it every few months and before festival and wedding seasons.
When a reorder spreadsheet stops being enough
A reorder level only helps if someone checks stock against it every day. With a few hundred products, several suppliers and stock arriving and leaving all day, a spreadsheet is out of date by lunchtime.
managemate does not work out the reorder level for you; you enter it, and this calculator is a good way to choose it. In each product's Restocking panel, set Reorder at, Order quantity and Usual supplier. The reorder list then shows every product whose available stock, not counting expired lots, plus what is already on order has fallen to that level. It suggests reorder level + order quantity − available − on order, rounded up to whole units of the product's stock unit, and creates one draft purchase order per supplier for you to check. Today's plan on the dashboard shows how many products need restocking, and the location switcher shows one shop's or godown's reorders at a time.
Reorder point calculator: common questions
What is the reorder level formula?
Reorder level = average daily sales × lead time in days + safety stock. If you sell 25 units a day, the supplier takes 6 days and you keep 50 units of safety stock, the reorder level is 25 × 6 + 50 = 200 units. Place an order when stock falls to 200.
How do I calculate safety stock?
The simplest way is safety days × average daily sales: 4 days of cover at 25 units a day is 100 units. A stricter way uses your worst case: maximum daily sales × maximum lead time − average daily sales × average lead time. With 40 units on the busiest day, 9 days at worst, 25 a day on average and a usual lead time of 6 days, that is 360 − 150 = 210 units.
What is the difference between reorder level and reorder quantity?
The reorder level tells you when to order, and the reorder quantity tells you how much. A shop might reorder biscuits when stock falls to 120 packets and order 300 packets each time. The calculator works out a quantity from the number of days you want an order to cover, rounded up to whole packs.
What lead time should I use?
Use the days from placing the order to having the stock ready to sell, averaged over your last few orders. Include the time to raise and pay for the order, transport, unloading and checking. If one supplier is often late, use From your worst case with the slowest delivery you have had.
Should I count stock that is already on order?
Yes. Compare the reorder level with stock on hand plus stock ordered but not yet received. If you have 80 units, 100 more on the way and a reorder level of 150, you do not need to order again yet.
How often should I recalculate reorder levels?
Every few months, and whenever sales or a supplier's delivery time changes. Before Diwali, Eid, the wedding season or school reopening, raise the levels of items that sell faster, and lower them afterwards so extra stock does not sit or expire.
Terms and other free tools
Give your team a clearer working day
Try every feature free for 60 days with up to 5 users. A guided setup brings in your products, contacts and opening stock from Excel.
- No card needed
- Then ₹299 per user a month
- 7-day money-back guarantee